PARS KAVAND INDUSTRY Co. AT A GLANCE

‘’ Pars Kavand Industry Co. is a privately owned company established in 2003 with a wide range of capabilities in Engineering, Technical Services and Supply of Equipment especially in the area of oil and gas industries and power plants. Thanks to the experienced Engineers who have been chosen from different industries with great knowledge in their designated field of activities, we have a good market stand in the mentioned industries. Our reputation is based on our experience, vision, and integrity of performance, enabling us to explore the best possible approach to meet our client’s needs. We provide professional engineering, consultation and training services along with supply of equipment and spare parts for all of our products in oil, gas, petrochemical, power and water and wastewater treatment industries. We cover a broad range of high quality products from world class manufacturers and supply their spare parts with competitive cost effective prices. Pars Kavand Industry Co. is a fast growing Company and intends to maintain its professional position with continuous improvement in engineering and training industrial equipment and systems. ’’

Images

OUR MISSION

‘’ Is to be an environmentally conscious, overall responsible, well managed for-customer enterprise that aims for future growth and development. ‘’
‘’ Is to have satisfied customer in all aspect of our mutual cooperation. ‘’
‘’ Is to innovate. We will strive to fully understand the problems of our clients and customers. We will remain open minded and explore new possibilities that lead to effective solutions. ‘’
‘’ Is to build and maintain alliances with those that share our interests and can contribute to and participate in our success. ‘’
‘’ We believe in education, customer satisfaction and market expansion. We will foster relationships that integrate the talent interests and goals of all our co-workers. ‘’

Electrochlorination Plant for South Pars Phase 15 & 16 Projects

Name: Electrochlorination Plant for South Pars Phase 15 & 16 Projects

Location: Assaluyeh, Iran
Status: Completed

Description: South Pars Development phase 15&16 required an Electrochlorination system to prevent organic fouling in the onshore and offshore cooling water pipeline. The system provides 3ppm of Hypochlorite of continuous dosing and 5ppm of shock dosing every 8 hours for 30mins. The units have a total capacity of 145kg per hour of Hypochlorite.

Electrochlorination Plant for South Pars Phase 19 Project

Name: Electrochlorination Plant for South Pars Phase 19 Project

Location: Assaluyeh, Iran
Status: Completed

Description: Pars Kavand Industry Co. was responsible for the detail design, procurement of complete system and ex-works delivery of the electro chlorination plant. Also the supervision of the installation at day rates quoted, and pre commissioning, commissioning and start in a two week period were included.

Name: Electrochlorination Plant for South Pars Phase 22 & 24 Projects

Location: Assaluyeh, Iran
Status: Completed

Description: South Pars Development phase 22&24 required an Electrochlorination system to prevent organic fouling in the onshore and offshore cooling water pipeline. The system provides 3ppm of Hypochlorite of continuous dosing and 5ppm of shock dosing every 8 hours for 30mins. The units have a total capacity of 145kg per hour of Hypochlorite.

Name: Sea Water Filtration System, Kavian Petrochemichal Plant

Location: Assaluyeh, Iran
Status: Completed

Description: Kavian Petrochemical plant produces two million tonnes of Ethylene per year supplying the downstream petrochemical plants. This plant required an input of 94,000 M³/h of water. This is supplied through a seawater intake system, the system required 9 automatic self-cleaning filters each with a maximum capacity of 11,000 M³/h and able to filter out particles which are over 1000 microns in size. The filters needed to have an automatic backflush mechanism in order to maintain a constant flow of water into the plant.

Name: Sea Water Filtration System South Pars Development Phase 15&16

Location: Assaluyeh, Iran
Status: Completed

Description: South pars development phase 15&16 has a sea water intake system supplying water to various processes and cooling systems. The scope of this project was to provide adequate filtration for some of the processes which required sea water. These filters, due to constant duty, needed to be of an automatic backflush variety to minimize down time and loss of flow. The filters were designed to filter out any coarse particle over 500 microns in size.

Name: Electrochlorination Plant for Iran LNG

Location: Tombak, Assaluyeh, Iran
Status: In Progress

Description: Iran LNG Plant required an Electrochlorination System in its Utility Package in order to prevent biological fouling in equipment like heat exchangers. The system provides 1ppm of Hypochlorite of continuous dosing and 4ppm of shock dosing every 8 hours for 15mins. The units have a total capacity of 330kg per hour of Hypochlorite.